    NEW PARKS & OPEN SPACES

    Saigeon Trail extension between Towerhill Road and Jefferson SideroadConstruction Underway
    A Public Open House was held on July 3, 2014 for residents to comment on  the proposed design of the Saigeon Trail extension. This project includes the construction of trails, boardwalks and a bridge. Construction is now underway and is expected to be complete by October 2016 (weather permitting). As a measure of safety, portions of the site will be fenced off during construction and all residents are asked to avoid entering the area.

    Proposed Saigeon Trail Extension Presentation Panels [PDF]
    Proposed Saigeon Trail Extension Context Map & Images [PDF]
    Proposed Saigeon Trail Extension Map [PDF]


    For more information, please contact James Condron, Project Manager, at 905-771-2486 or james.condron@richmondhill.ca.

     


    Lake Wilcox Park - Construction Underway
    The Lake Wilcox shoreline is getting a makeover! The new promenade is now open and construction of the boardwalk is underway. We're also proposing to create a youth area at the south end of the park. For more information about this project, visit RichmondHill.ca/LakeWilcoxPark.
     

    TransRichmond Trail Gamble Glen ConnectionDesign Underway
    A new trail connection between the existing TransRichmond Trail and Gamble Glen Crescent (located south of Gamble Road, east of Bathurst Street) is currently in the design stage. The alignment will be selected to keep environmental impacts to a minimum. Construction is scheduled for fall 2016.

    TransRichmond Trail Gamble Glen Connection Map [PDF]
    TransRichmond Trail Gamble Glen Connection Site Context [PDF]
    TransRichmond Trail Gamble Glen Proposed Trail Alignment [PDF]
    TransRichmond/Gamble Glen Trail Character [PDF]

    For more information, please contact Samuel Ng, Project Manager at 905-747-6463 or samuel.ng@richmondhill.ca.
     

    Hidden Springs ParketteDesign Underway
    A new parkette on Arten Avenue, south of Elgin Mills Road, west of Yonge Street is currently in the preliminary design stage. The parkette will include a junior playground, a senior playground, seating areas and plantings. Construction is scheduled for June 2016.

    Hidden Springs Parkette Location Map [PDF]
    Hidden Springs Parkette Proposed Design [PDF]


    For more information or to comment on the proposed design, please contact Samuel Ng, Project Manager at 905-747-6463 or samuel.ng@richmondhill.ca.




    Jefferson Salamander Park (proposed name) - Design Underway
    A new on the east side of Bayview Avenue (across from Oak Ridges Community Centre) and south of Bethesda Side Road is currently in the preliminary design stage. The proposed design will include a natural playground with swings, shade structure, pedestrian lighting, seating areas and plantings. Construction is proposed for 2017, pending budget approval.

    Town staff held a public open house on June 21, 2016 to discuss the proposed design with the neighbourhood. Based on the comments received, the Town plans to proceed with the design with minor changes.

    New Park on Anchusa Drive Location Map [PDF]
    New Park Pre-Design Public Consultation Survey Summary [PDF]
    Jefferson Salamander Park - Existing Conditions [PDF]
    Jefferson Salamander Park - Concept Plan [PDF]
    Jefferson Salamander Park - Playground [PDF]

    For more information, please contact Kristina White, Project Manager at 905-747-6397 or kristina.white@richmondhill.ca.



    ENHANCEMENTS TO CURRENT PARKS & TRAILS

    Hughey ParkConstruction underway
    The Town is planning to replace the playground at Hughey Park (located on Fern Valley Crescent, west of Bloomfield Trail, south of Bloomington Road West) and upgrade the site to meet current standards. Construction is scheduled to begin in late June 2016 and completed by December 2016 (weather permitting). As a measure of safety, the site will be fenced off during construction and all residents are asked to refrain from entering the park.

    Town staff held a public open house on Wednesday, June 10, 2015 to discuss the proposed design with the community. Based on this meeting, the Town plans to proceed with the design as presented.

    Hughey Park Location Map [PDF]
    Hughey Park Existing Conditions [PDF]
    Hughey Park Landscape Plan [PDF]

    For more information, contact John Tiberio, Project Manager at 905-747-6389 or john.tiberio@richmondhill.ca.
       

    Richvale Greenway North Bridge Replacement – Construction to begin shortly
    The Town is planning to replace an existing pedestrian bridge that crosses the East Don River located north of May Street, east of Kersey Crescent. The bridge will be raised and realigned with a new 14 metre pedestrian bridge. Stream rehabilitation work may also be required. We are currently in the design stage. Construction is proposed for 2016 pending budget approval.

    Richvale Greenway North Bridge Location Map [PDF]

    Richvale Greenway North Bridge Proposed Concept [PDF]

    For more information, please contact John Tiberio, Project Manager at 905-747-6389 or john.tiberio@richmondhill.ca.
     


    Little Don Park - Design Complete, Construction deferred until 2017
    The Town will be replacing some facilities within the park and upgrading them to meet current demands. The design is complete and the project will be tendered in the fall. Construction is scheduled to begin in May 2017.

    Town staff held a public open house on June 11, 2015 to discuss the proposed design with the community. Based on the comments received, the Town plans to proceed with the design with minor changes.

    Little Don Park Location Map [PDF]
    Little Don Park Pre-Design Public Consultation Survey Summary [PDF]
    Little Don Park Proposed Design [PDF]

    For more information, please contact Kristina White, Project Manager at 905-747-6397or kristina.white@richmondhill.ca.

     


    Cordave Parkette – Design Underway
    The Town will be replacing some facilities within Cordave Parkette and upgrading them to meet current demands. We are currently in the design stage. Construction is proposed for 2016 pending budget approval.

    Cordave Parkette Location Map [PDF]
    Cordave Parkette Proposed Design [PDF]

    For more information, please contact Mike McCallum, Project Manager at 905-771-2469 or mike.mccallum@richmondhill.ca.
     



    Grace Lawrence Parkette - Design Underway
    The Town will be replacing some facilities within the park and upgrading them to meet current demands. The proposed improvements include new junior and senior play equipment with swings, sand play area, seating, and additional planting. Construction is proposed for 2017, pending budget approval.

    Town staff held a public open house on June 28, 2016 to present the proposed design with the neighbourhood. Based on the comments received, the Town plans to proceed with the design with minor changes.

    Grace Lawrence Parkette Location Map [PDF]
    Grace Lawrence Parkette Existing Conditions [PDF]
    Grace Lawrence Parkette Concept Plan [PDF]
    Grace Lawrence Parkette Playground Equipment [PDF]

    For more information, please contact Kristina White, Project Manager at 905-747-6397 or kristina.white@richmondhill.ca.


    David Hamilton Park Master Plan

    David Hamilton Park Master Plan [PDF]

    For more information, please contact Tracey Steele, Manager of Park & Natural Heritage Planning at 905-771-2476 or at tracey.steele@richmondhill.ca.




    Morgan Boyle Park Canada 150 Revitalization Project – Design Underway
    This community park located on Pearson Avenue just north of Garden Avenue, west of Yonge Street is in the preliminary redesign stage. The existing junior and senior playground will be renewed and enhanced with the addition of a new Canada 150 themed splash pad. The existing parking lot, senior soccer field, slo-pitch softball diamond and tennis courts will also be renewed. Check out the video or the PDF below to see the proposed design. Construction is proposed for 2016, contingent upon budget approval.

    Public Open House & Comment Period 
    Residents were invited to view and comment on the proposed design for the revitalization of Morgan Boyle Park at an Open House on December 1.

    If you were unable to attend the meeting, please feel free to send us your feedback using the comment sheet at the link below.

    Morgan Boyle Park Canada 150 Revitalization Proposed Design [PDF]
    Morgan Boyle Park Canada 150 Revitalization Comment Sheet [PDF]

    For more information, please contact Samuel Ng, Project Manager at 905-747-6463 or samuel.ng@richmondhill.ca.



    Bradstock Park - Design Underway
    The Town will be replacing some facilities within the park and upgrading them to meet current demands. We are currently in the concept design stage. Construction is proposed for 2017, pending budget approval.

    Staff held a public open house on July 6 to present the proposed design to the community. If you were unable to attend, but would like to provide us with feedback, you can view the concept plans at the links below. Comment sheets can be sent to mike.mccallum@richmondhill.ca until July 25. 

    Bradstock Park Location Map [PDF]
    Bradstock Park Existing Conditions [PDF]
    Bradstock Park Concept Plan [PDF]
    Bradstock Park Play and Fitness Equipment [PDF]
    Bradstock Park Comment Sheet [PDF]

    For more information, please contact Mike McCallum, Project Manager at 905-771-2469 or mike.mccallum@richmondhill.ca.




    Humber Flats Ecopark Raintree Crescent Playground - Design Underway
    The Town is planning to replace and upgrade the Raintree Crescent playground at Humberflats Ecopark to meet current standards. Construction is planned for 2017 pending budget approval.

    Staff held a public open house on June 27 to present the proposed design to the community. If you were unable to attend, but would like to provide us with feedback, you can view the concept plans at the links below. Comment sheets can be sent to james.condron@richmondhill.ca until July 11.

    Humber Flats Ecopark Playground Existing Conditions [PDF]
    Humber Flats Ecopark Playground Design Concept [PDF]
    Humber Flats Ecopark Playground Theme Elements [PDF]
    Humber Flats Ecopark Playground Comment Sheet [PDF]

    For more information, please contact James Condron, Project Manager at 905-771-2486 or james.condron@richmondhill.ca.

     

  • Town of Richmond Hill
    Contact Us Departments Disclaimer Privacy Click for more information on the Town's Character Community initiative
    Town of Richmond Hill
    Get Flash Player
    Town of Richmond Hill
    Get Adobe Reader
    Town of Richmond Hill Search by Google Town of Richmond Hill


    Contact Us Departments Town of Richmond Hill Disclaimer Privacy Text Only