Council Highlights
Ed Sackfield Arena Expansion Project Moves Forward
Council approved the schematic design for the Ed Sackfield Arena expansion. The planned expansion complements and enhances the existing facility with the addition of a much needed NHL-size arena with viewer capacity of 350 people. The expansion will also increase the accessibility of Ed Sackfield Arena with a covered walkway at the entrance, six barrier-free player change rooms and two for referees/coaches and accessible washrooms. Richmond Hill’s growing demand for arena space will be eased with the additional ice pad, which is supported by Richmond Hill's 2013 Recreation Plan. All residents will be able to enjoy the facility, even those who do not play hockey or ice skate as the new facility will also include a180-metre indoor walking track and community programming and meeting room space. The construction of the arena will be completed in 2018. The estimated project cost is $20,651,400 and the project architects will now proceed to the detailed design phase. Schematic drawings of the expansion project can be seen on RichmondHill.ca under the May 2 Committee of the Whole meeting, agenda item 5. For more information about the arena, contact Darlene Joslin, Director, Recreation and Culture at 905-771-2423. For more information about the construction, contact Pat Caron, Director, Asset Management at 905-771-2403.
Everything old will be new again – Revitalizing David Hamilton Park
Council approved a Master Plan for the revitalization of David Hamilton Park. The 10.4ha community park located at Valleymede and Highway 7 is named after a former Commissioner of Parks and Recreation. It was originally constructed in 1987 and many of the facilities within the park are at the end of their lifespan. The Master Plan was developed with community input. Highlights of the Master Plan include the addition of a multi-use court, outdoor fitness equipment and a splash pad, replacement of the existing playgrounds and improvements to lighting, pathways and landscaping. Work on detailed design is underway and construction is expected to begin in 2017. Richmond Hill is home to more than 166 parks and 544 hectares of natural, environmental area. Throughout our parks system you can find athletic fields, nature trails, walkways, playgrounds, picnic areas, tennis courts, open space, etc. For more information, contact Tracey Steele, Manager of Park & Natural Heritage Planning at 905-771-2476.
May 30 is Bike to Work Day
Council proclaimed May 30 Bike to Work Day in Richmond Hill. Richmond Hill works with Smart Commute Markham Richmond Hill to encourage those who live and work in Richmond Hill to carpool, use transit, cycle or walk to work. Compared to car use, these modes avoid or improve traffic congestion, save you money and can improve personal health. In recognition of Bike to Work Day, Smart Commute Markham Richmond Hill will host a 7.5 kilometre ride in the East and West Beaver Creek Corridor. The route will include the Highway 7 bike lanes and an off-road section through David Hamilton Park. Participants can network with other cyclists and win prizes. For more information visit www.smartcommutemrh.ca or contact Josh Ward, Sustainable Transportation Coordinator at 905-747-6340.
