The Access Richmond Hill Contact Centre provides assistance for general inquiries, responds to questions or concerns regarding programs and services as well as accepts in person payments.
905-771-8800
Hours of Service:
Monday through Friday, 8:30 a.m. to 4:30 p.m.
Report a problem with a service, e.g. missed garbage collection, overnight parking, potholes, street lights, etc.
Additional residential units (ARUs) are permitted in the City of Richmond Hill, subject to zoning requirements and restrictions, including a building permit.
An ARU is a self-contained unit with a private kitchen, bathroom facilities and sleeping areas in:
ARUs have also been referred to as secondary suites, basement apartments, two-unit dwellings, granny flats, in-law suites, accessory apartments, laneway houses, coach houses, garage suites and garden suites.
Zoning Regulations | ||||||||||||
The Government of Ontario approved Bill 23, the More Homes Built Faster Act, 2022, on November 28, 2022. Bill 23 implements significant changes to several Acts in the Province, including the Planning Act, with the goal of facilitating the construction of 1.5 million new homes in the Province over the next 10 years. Bill 23 introduced changes to the Planning Act relating to Accessory Residential Units (ARUs). Three residential dwelling units are now permitted on a “parcel of urban residential land” containing a single detached house, semi-detached house and townhouse. The permitted three residential dwelling units include the primary dwelling unit located in the single detached house, semi-detached house or townhouse and two ARUs:
A “parcel of urban residential land” is a parcel of land that is within a Settlement Area and where residential use, other than ancillary residential use, is permitted and served by full municipal water and sewage services. Existing dwellings on parcels of land that are not municipally serviced may be permitted one ARU within the primary dwelling unit and/or one ARU within an accessory building in accordance with the City of Richmond Hill Zoning By-laws. The following City of Richmond Hill Zoning By-law requirements, as amended by Bill 23 changes to the Planning Act, also apply:
Exceptions may apply. You are encouraged to contact the City prior to applying for a building permit for your ARU. Properties located within the Toronto and Region Conservation Area (TRCA) regulated area must obtain approval from TRCA for the ARUs. Please refer to the City's ARU By-law 13-21, as amended and the applicable zoning by-laws for the subject property. If you require further assistance, please contact the City. |
||||||||||||
Applying for a Building Permit | ||||||||||||
Before you apply for a building permit, it is important to note: Drawings by qualified professionalsDrawings required as part of the building permit application should be prepared and reviewed by a qualified professional as outlined in the Ontario Building Code. A qualified professional can be an architect, professional engineer or a BCIN qualified designer. Delays in the issuance of your permit can arise if your drawings are not complete and/or do not conform to the OBC and the applicable laws. Building permit submissionsBuilding permit submission requirements can differ slightly. ARU after July 14, 1994For a newly proposed ARU or a secondary suite that existed after July 14, 1994, a Change of Use permit is required. You must submit:
If your house is less than five years old, the proposed renovation must satisfy the full construction requirements under the Ontario Building Code. The Building Code recognizes the challenges associated with older buildings. Therefore, if your house is at least five years old, you may be subject to less stringent requirements under the Ontario Building Code. Existing ARU prior to July 14, 1994If your ARU has been in existence prior to July 14, 1994, a Change of Use permit is not required and zoning exemptions may apply; however, you must still apply for a building permit and comply with the Ontario Fire Code (Retrofit section 9.8). In addition to the required list of documents, you must also prove the ARU existed on or before July 14, 1994 by submitting:
And any one of the following:
Please note: real estate listings are not acceptable forms of proof. Apply for a building permit. |
||||||||||||
Booking a Building Inspection | ||||||||||||
Once the building permit has been issued, construction can begin. As required by the Ontario Building Code, a building inspector must review the work at various stages of construction. The property owner or his/her agent is responsible for notifying the City's Building Division when different stages of construction are ready for inspection. You can book an inspection by completing the Inspection Request Form. Once all inspections are completed, an Occupancy Permit will be issued. Please note: For building permits subject to retrofit section 9.8 of the OFC (i.e. if your ARU was in existence prior to July 14, 1994), you must book the inspection with the Richmond Hill Fire and Emergency Services by calling 905-883-5444. |
Email building@richmondhill.ca or call 905-771-8810.
Email buildinginspections@richmondhill.ca or call 905-71-5465.
The property owner must attain a separate electrical permit for electrical work from the Electrical Safety Authority (ESA) as the Electrical Safety Code has further requirements when adding an ARU. For additional information, call 1-877-ESASAFE (372-7233).
If you are concerned that an ARU has been established without the benefit of a building permit or is not in compliance with the Ontario Building Code, please email buildinginspections@richmondhill.ca
If you have a complaint about your landlord or your tenant, contact the Landlord and Tenant Board at 1-888-332-3234.
When considering whether establishing an ARU is right for you, please refer to the following resources: